Software QA & Testing.
Unit, e2e, load — the boring safety net.
A test suite that catches regressions before your users do — enforced in CI, not audited quarterly.
What it is
A test suite is only useful if it can fail the build. Otherwise it's decoration.
Software QA & Testing builds the test surface most teams under-invest in: unit, integration, end-to-end, load, security, and accessibility — all wired into CI so regressions fail the build, not the retro.
We start with a coverage audit, identify the highest-risk untested paths, and add tests where they'd have caught real production incidents. Not chasing 100% coverage — chasing signal.
The output is a test suite your team trusts to gate deploys — with fast, parallel execution and clear failure diagnostics.
What you get
6 concrete things, on the SOW.
Every deliverable is written into the statement of work — priced, dated, and signed off by a named engineer at the relevant gate.
- 01Unit + integration + e2e test suites
- 02Load testing with regression baselines
- 03Security testing (SAST/DAST + red-team)
- 04Accessibility testing per route
- 05CI integration with fail-the-build gates
- 06Flaky-test hunt and remediation
Where this shows up
Three shapes of engagement.
Different problems, same method. These are the concrete work shapes we typically deliver under Software QA & Testing.
Test suite audit
A written assessment of your current coverage, gaps, and highest-risk untested paths.
Test surface build
Add unit, integration, and e2e coverage to a system that's under-tested.
Continuous QA
Ongoing test-and-remediate cycles as part of an embedded engagement.
The stack
Capabilities, not vendors.
The requirement picks the tool, not the other way round. Naming vendors up front would set the wrong ceiling on what we take on.
- Unit frameworks
- e2e (Playwright/Cypress)
- Load testing (k6)
- SAST/DAST
- A11y tooling
- CI integration
How it runs
Seven stages. One signature at a time.
Every Software QA & Testing engagement runs through the same seven-gate Aivora Delivery Engine — each stage run by specialised agents, each ending at a gate a senior engineer must sign.
Frequently asked
Questions people ask before booking.
What coverage target do you aim for?
Not 100%. We aim for coverage on the paths that would have caught real production incidents in the last year — and full coverage on the highest-risk services.
How do you handle flaky tests?
Flaky tests are treated as bugs — they get fixed or deleted, never retried-until-green. Retry-until-green is how a test suite dies.
Can you do this without slowing down deploys?
Yes — parallel test execution and smart selection (only affected tests on PR, full suite on main). Slow tests get an optimisation ticket, not a tolerance budget.
Ready when you are
Bring us the hard bit.
Ninety-minute kickoff. Five-day audit. Fixed quote for Software QA & Testing — in writing, before we build.